Market

Energy Storage / Electric Utility

Service

Hazard Mitigation Analysis, Emergency Operation Plan, Pre-Operation Evaluation & Fire Department Training

The Alvin battery energy storage system (BESS) is a 9.95 MW / 9.95 MWh facility on Heights Road in Brazoria County, Texas. The installation connects to the ERCOT grid through Texas-New Mexico Power.

EFP prepared a site-specific Hazard Mitigation Analysis (HMA) that evaluated the battery equipment in its installed layout and documented the basis for fire and explosion protection under the applicable fire code. EFP also developed a site-specific Emergency Operation Plan (EOP) covering response procedures and responder coordination.

Alvin commissioning and inspection. Before startup, EFP performed pre-operation evaluation to review enclosure condition, ventilation, detection and alarms, and fire protection test records. EFP briefed local fire departments on battery equipment, site hazards, responder safety, and the site’s emergency plan, including notification and shutdown procedures. The walkthrough familiarized responders with access and exit routes, the site perimeter, and major equipment.